Innovative Retrofit Design in Wales

Overview

In 2023, Flood Control International was approached to improve the performance and operation of a double-leaf mitred floodgate in South Wales. The existing gates were struggling with performance issues due to low ground clearance, resulting in rapid wear of the bottom seals and ineffective sealing along the sloped threshold. Additionally, the gates were difficult to operate and struggled to latch and seal properly in the centre. Faced with these challenges, Flood Control International was tasked with finding an innovative solution to enhance the functionality of the existing gates.

The Requirement

The client needed a solution that would address several key issues:

  • Low ground clearance: The existing gate design caused rapid wear of the bottom seals, leading to ineffective sealing.
  • Cumbersome operation: The gates were difficult to operate, requiring excessive effort to latch and seal in the centre.
  • Sealing inefficiencies: The gates did not seal properly along the sloped threshold, which compromised flood defence effectiveness.
  • Cost-effective and eco-friendly: The solution had to be cost-effective and environmentally sustainable, avoiding the need for new gates or extensive replacements.

The Solution

Flood Control International’s team embraced the challenge and proposed a unique retrofit solution that would address the issues while also delivering significant cost savings and environmental benefits. Instead of replacing the old gates, we designed a retrofit modification to convert the existing gates into lift-hinge gates. Retaining the gate panels and modifying the hinge and locking mechanisms meant that the gates could swing freely to open/close and then lower onto new base seals. Recent client feedback was that ‘the gates work beautifully and the local users are very happy’.

This innovative approach not only improved performance and operator experience, but also saved costs and carbon, demonstrating our commitment to sustainable solutions.

The Client

Natural Resource Wales

Main Contractor: Integral UK
Location: South Wales
Year: 2023-2024